Command Pulse
Westline DC — Inland Empire · make the knowledge survive the shift change
Westline DC accuracy pulse
96.4%
Target 99.9% · gap of 3.5 pts
Last 14 days
Three and a half points of gap is roughly a six-piece miscount per pallet family per week. That is audit exposure, not a rounding error.
Hot racks
Repeated variances- RCV-D2Receipts closing without verification2
- BULK-03Counts run during live unload2
- A-14-02Slot drift from the retired home slot1
- WC-01Staged-not-scanned shorts1
Grave shift handoff
Add a note“Do not run the bulk cage count while door 3 is still unloading. Half the pallet is on the floor and half is in the rack, count comes out wrong every single time.”
Jamal RiversFX-021Active“Grave shift keeps slotting the 2 inch family into A-14 because that used to be the home slot. It moved to A-14-03 in the spring. That drift is where the six-piece variances come from.”
Jamal RiversFX-041Needs Review“Receiver on grave scanned the whole Valley Gas pallet to PO without a heat-treat look. Second time this month.”
Jamal RiversStill needs review
What does the floor know that the system doesn’t?
Dump the note the way you’d say it on the radio. Fenyx does the structuring.